Cables & Plugging
Home ] Driver Installation ] Control Card Installation ] Install Runtime Engine ] Software Installation ] Drive Configuration ] [ Cables & Plugging ] Control Card Testing ] System Tuning ] Testing Under Load ] Axis Setup ] Limits ]


 

Prepare the system for remote operation by plugging E-stop and axis control

NOTE--Be sure to have motors/drives powered down during this procedure.

  • Plug encoder lines, keeping sure to match axis numbers with the desired motor.
     
  • Plug control lines, again keeping sure to match axis numbers with the desired motor.
     
  • Plug E-stop run station.
     

 


 

[Back] [Home] [Next]


09 Jun 2003